13523220009

Precautions for the production and use of concrete slatted flooring

TIME:2026-01-28  CLICK:90

  Concrete manure leakage boards are popular equipment components in modern pigsties. Improving the quality of these boards and extending their service life can reduce the construction and operating costs of pigsties. The production of concrete manure leakage boards must strictly adhere to relevant standards, ensuring strict quality control throughout the entire process, from the arrival of raw materials at the factory to the transportation, loading, and unloading of finished products.

  1. To improve the quality of concrete slabs with fecal leakage, during the production process:

  1. The automation level of cement slatted floor production equipment has been enhanced, resulting in increased production efficiency and improved standardization of automated operations;

  2. Under the premise of the current equipment level, by establishing enterprise standards, we will strictly adhere to the regulations from the entry of raw materials, through the entire production process, to the transportation, loading, and unloading of finished products, in order to produce concrete slabs with good quality.

20171101_101743

  II. Precautions for the use of concrete slatted flooring:

  Taking pig farms as an example, once a pig farm is built, the cement slatted flooring used is basically non-replaceable. The use of American-style slatted flooring is quite evident, so it is important to choose better quality cement slatted flooring when building the farm. Under the same quality requirements, priority should be given to selecting cement slatted flooring with a better production process:

  For the construction of pig farms with fewer than 500 foundation sows, it is recommended to use European-style slatted flooring to prevent feces leakage;

  2. For large-scale intensive pig farms, it is recommended to choose American-style slatted flooring.

  When using cement slatted flooring, appropriate protective measures should be taken:

  1. A rubber mat can be laid under the feed trough to prevent the feed scattered on the leaking board from spoiling and causing damage to the concrete;

  2. The feed trough and waterer should be kept at a distance, or a dry and wet automatic feed trough can be chosen;

  3. When cleaning the rotating column, the pressure of the high-pressure water gun should not exceed 4 kg.

  References:

  Qian Zhongming, "Overview of Cement Leakage Boards"

  Zhu Mingfei et al., "Production Process and Quality Control of Concrete Slatted Floor for Pigs"

  Statement: If you need to reproduce or quote this article, please communicate with our online customer service to obtain permission and indicate the source of the article in the reproduction. Some of the graphic materials mentioned in this article are sourced from the internet, industry documents, and relevant reference books. If there are any objections, please communicate with us for correction or deletion. The information stated in this article is for reference only. Regarding the applicability and effectiveness of the matters mentioned in this article, readers should make their own judgments and use them according to the specific situation of the project site.


Xinxiang Ruite Machinery Co., Ltd

CONTACT:Manager Li 13523220009

TEL:0373-7774868

ADDRESS:South of the middle section of Weiqi Road, Xinxiang Economic and Technological Development Zone

Follow us

LINK:

Xinxiang Ruite Machinery Co., Ltd ICP: